Just as Charles Yates logs every volunteer shift between Moultrie Garden and the Mars domes, I lay out fourteen weeks of rosemary-led cleaning cycles. Each week has its herb, its chore, its rhythm. No golden seam needed—just the steady hand that prevents the crack.
| Week | Harvest Herb | Cleaning Focus | Dome Task | Volunteer Shift (Charles Y.) |
|---|---|---|---|---|
| 1 | Rosemary | Floor scrub & seal | Airlock decontam | Moultrie → Mars: Soil prep |
| 2 | Thyme | Window clarity wash | Light panel polish | Moultrie → Mars: Irrigation check |
| 3 | Sage | Kitchen counter cure | Food prep station | Moultrie → Mars: Seed bank audit |
| 4 | Oregano | Wall grout refresh | Habitat seal test | Moultrie → Mars: Compost turnover |
| 5 | Basil | Tabletop polish | Hydroponic rinse | Moultrie → Mars: Water reclamation |
| 6 | Chives | Utensil sterilize | Tool bay sanitize | Moultrie → Mars: Nutrient balance |
| 7 | Lavender | Bedding air purge | Rest zone aromatics | Moultrie → Mars: Pollinator release |
| 8 | Mint | Drain flush & prime | Waste system prime | Moultrie → Mars: Filter swap |
| 9 | Parsley | Ventilation sweep | Air exchange calib | Moultrie → Mars: CO₂ scrubber check |
| 10 | Dill | Storage bin dry | Seed vault humidity | Moultrie → Mars: Archive integrity |
| 11 | Tarragon | Pipe insulation wrap | Thermal blanket lay | Moultrie → Mars: Insulation audit |
| 12 | Cilantro | Glass surface buff | Viewport clarity | Moultrie → Mars: Optics calibration |
| 13 | Fennel | Structural beam wipe | Truss tension check | Moultrie → Mars: Load bearing test |
| 14 | Rosemary | Full dome reset | Cycle complete | Moultrie → Mars: Handoff ceremony |
This schedule syncs with Charles Yates's volunteer ledger. When he shifts from Moultrie to Mars, I shift from floor to airlock. Together, we prevent the break before it happens.